LeDuc & Dexter Inc. 2833A Dowd Drive P.O. Box 11157 Santa Rosa, CA 95406
TEL (707) 575-1500 FAX (707) 575-1276 CL 548129 |
|
|
WILLIAM MCDEVITT McDevitt & McDevitt Construction Corp. |
|
"The Polycold project required weekly design team meetings that included 10 to 15 people. LeDuc & Dexter coordinated
design of process waste system, compressed air delivery, chillers & chilled water system, heat exchanger, piping support trapeze, natural gas lines and new bathrooms. Their field crews
implemented a super fast schedule while turning out first quality work. Each phase was completed on schedule. They provided a low maintenance, high
quality manufacturing & test facility for Polycold." |
IGC-Polycold Systems, Inc. 3800 Lakeville Rd. Petaluma, CA
Design/Build
Manufacturing plant, retro-fit for existing building
Overhead Trapeze Pipe Racking System
Installation of Compressors & Cooling Towers
Underground Process Wasted system
Solids Interceptor & Ejector piping
Heating/Cooling Piping
Restroom plumbing & fixtures
Emergency shower & eye wash station
(Click on thumbnails for a larger view.)
Trapeze Racking System |
New Cooling Towers |
| |
|
Overhead Production Piping |
Cooling Water System |
| |
|
Compressed Air Piping at Equipment Yard |
Emergency Deluge Shower & Eye Wash Station |
| |
|
Cooling Water & Vent Piping at Product Testing Stations |
Product Testing Piping |
| |
|
Jeff Shank LeDuc & Dexter Project Leader |
Back to Clients |
|
|